Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2011/12/20
Orleans Conservation Commission                                 

Hearing Meeting Nauset Room                     December 20, 2011
8:30 a.m.       Call to Order   

Continuation
Last Heard 12/6/11 (JB1, JO1)
Charles Silbert                                 40 Gesner Road
by East Cape Engineering, Inc., Assessor’s Map 42, Parcel 91.  The proposed removal of an existing dwelling, construction of a single family dwelling, garage, and installation of a new water line and paved driveway.  Work will occur within 100’ of the Edge of Wetland, Top of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and the Pleasant Bay A.C.E.C.  

Notice of Intent
Stephen Brodeur                                         25 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4.  The proposed reconstruction of a stone revetment, installation of stone retaining walls, removal of existing patio areas, and mitigation plantings.  Work will occur on the Top of a Coastal Bank, within Land Subject to Coastal Storm Flowage, and within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, and the Nauset Estuary.

Certificate of Compliance
Pat & Jim Robert (2008)                                 207 Barley Neck Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of a dwelling, installation of a septic system and utilities, construction of a driveway, grading, landscaping, removal of invasive species, and restoration of a native plant community.

Administrative Reviews
Joe Spalluto                                                    14 Sages Way
The proposed over-dig for a foundation wall for an addition.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Capizzi Home Improvement.

Beatrice Auty                                                   16 Lake Farm Lane
The proposed removal of a leaning oak tree.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Lindsay Strode of Cape Organics.  

Karen Marcarelli                                                551 S. Orleans Road
The proposed removal of two pine trees.  Work will occur within 100’ of the Top of an Inland Bank.  Work to be done by A to Z Treez.

Lee & Barbara Ragsdale                                  7 Prence Lane
The proposed pumping, filling, and abandoning of an existing cesspool.  Work will occur within 100’ of the Edge of Wetland and the Cape Cod Bay A.C.E.C.  Work to be done by Brady Construction Company.  

Chairman’s Business
Approval of the Minutes from the Meeting on December 13, 2011

Other Member’s Business

Administrator’s Business

Site Visits

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.